The gas main installation in your neighborhood has been completed within the last 1-2 years. Therefore, it is time to start our final paving of the gas trench. The streets that will be included at this time are:
Hibernia Road
Oneida Ave
Iroquois Ave
Calumet Ave
Mohawk Ave
Monhegon Ave
Sioux Ave
Seneca Ave
Nokomis Ave
Roanoke Ave
Oakwood Terr
Willow Rd
Hilltop Dr
Dacotah Ave
Huron Ave
Navajo Ave
White Meadow Rd
West Lake Shore Dr (between Jackson Ave and Comanche Ave)
The time to convert to natural gas is prior to the paving on your street. If you are interested in converting your heating system, please follow the attached instructions.
Thank you
Brian Klinger